This is the story of how my husband and myself built our dream home. It’s located in Chiang Mai, Thailand. Being the entrepreneurial types that we are, we hired some local laborers and managed the build ourselves.
Table of Contents
ToggleFormwork and foundations!
With utilities connected, it was time to start on the foundations. We hired several laborers from the local village, got deliveries of rebar and wood, and began to make the footings and dig the foundation holes.
Prior to making anything, we stringed out the house room by room, to make sure everything was ok with the plans.
Columns and concrete pour
The next week is focussed on building up the columns. First the rebar is made, then the forms are built, then the concrete is poured. After the concrete is dried and the forms are removed, we infill more soil to the level of the top of the horizontal beams. This is so a concrete floor can be poured later.
Add Your Heading Text Here
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Add Your Heading Text Here
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Add Your Heading Text Here
Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.